Acceleration of bridge construction with prolonged service life

dc.contributor.advisor Brent M. Phares
dc.contributor.advisor Behrouz Shafei
dc.contributor.author Pakhale, Anmol
dc.contributor.department Department of Civil, Construction and Environmental Engineering
dc.date 2018-08-11T06:06:23.000
dc.date.accessioned 2020-06-30T03:09:20Z
dc.date.available 2020-06-30T03:09:20Z
dc.date.copyright Sun Jan 01 00:00:00 UTC 2017
dc.date.embargo 2001-01-01
dc.date.issued 2017-01-01
dc.description.abstract <p>A large number of bridges in the US are close to their lifespan or are really old. These bridges either need a replacement or some kind of rehabilitation. This has led to increase in the bridge construction projects and with a simultaneous increase in traffic demand, there is a need to accelerate the bridge construction and prolong the bridge life while lowering the construction cost.</p> <p>To achieve the objective of faster construction with prolonged life and reduced cost an approach known as the “get in, get out, stay out” was applied in one of the projects in this thesis. For this approach, three innovative concepts were included in the replacement of a bridge in Buchanan County of Iowa. The innovative concepts included Geo-synthetic Reinforced Soil (GRS) for the foundation, using prefabricated beams for superstructure and use of internal curing concrete for the beams. The constructed bridge was then monitored over three years through load testing and visual inspection. The bridge beams were found to be structurally sound over the three years of testing.</p> <p>In addition to the construction of the new bridge with the innovative concepts, it is also important to improve the bridge service life. Bridge deck overlays significantly increase the service life of bridges. Current processes and practices are time-consuming and multiple opportunities may exist to reduce overall construction time by modifying construction requirements and/or materials utilized. This work included three major tasks with literature review, field investigation, and laboratory testing. Through the results and observations of these tasks, several conclusions were made, which could reduce bridge deck overlay construction time.</p>
dc.format.mimetype application/pdf
dc.identifier archive/lib.dr.iastate.edu/etd/16188/
dc.identifier.articleid 7195
dc.identifier.contextkey 11457131
dc.identifier.doi https://doi.org/10.31274/etd-180810-5817
dc.identifier.s3bucket isulib-bepress-aws-west
dc.identifier.submissionpath etd/16188
dc.identifier.uri https://dr.lib.iastate.edu/handle/20.500.12876/30371
dc.language.iso en
dc.source.bitstream archive/lib.dr.iastate.edu/etd/16188/Pakhale_iastate_0097M_16887.pdf|||Fri Jan 14 20:56:12 UTC 2022
dc.subject.disciplines Civil Engineering
dc.title Acceleration of bridge construction with prolonged service life
dc.type thesis en_US
dc.type.genre thesis en_US
dspace.entity.type Publication
relation.isOrgUnitOfPublication 933e9c94-323c-4da9-9e8e-861692825f91
thesis.degree.discipline Civil Engineering
thesis.degree.level thesis
thesis.degree.name Master of Science
File
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Pakhale_iastate_0097M_16887.pdf
Size:
10.01 MB
Format:
Adobe Portable Document Format
Description: