Utility cut repair techniques: investigation of improved utility cut repair techniques to reduce settlement in repaired areas, Phase II

Thumbnail Image
Date
2008-01-01
Authors
Videkovich, Kathlyn
Major Professor
Advisor
Vernon R. Schaefer
Mohannad Suleiman
Halil Ceylan
Committee Member
Journal Title
Journal ISSN
Volume Title
Publisher
Altmetrics
Abstract

Trench maintenance problems are caused by improper backfill placement and construction procedures. This thesis is part of a multi-phase research project that aims to improve long-term performance of utility cut restoration trenches. The goal of this research is to improve pavement patch life and reduce the maintenance of the repaired areas. The objectives were to use field-testing data, laboratory testing data, and long-term monitoring (elevation survey and FWD testing) to suggest and modify recommendations from Phase I and to identify the principles of trench subsurface settlement and load distribution in utility cut restoration areas by using instrumented trenches. The objectives were accomplished by monitoring local agency utility construction from Phase I, constructing and monitoring the recommended trenches from Phase I, and instrumenting trenches to monitor changes in temperature, pressure, moisture content, and settlement as a function of time to determine the influences of seasonal changes on the utility cut performance.

Series Number
Journal Issue
Is Version Of
Versions
Series
Type
thesis
Comments
Rights Statement
Copyright
Tue Jan 01 00:00:00 UTC 2008
Funding
Subject Categories
Supplemental Resources
Source