Evaluation of accelerated bridge construction methods and designs in the state of Iowa

dc.contributor.advisor Terry J. Wipf
dc.contributor.advisor Brent M. Phares
dc.contributor.author Becker, Matthew
dc.contributor.department Department of Civil, Construction and Environmental Engineering
dc.date 2018-08-11T17:13:57.000
dc.date.accessioned 2020-06-30T02:29:22Z
dc.date.available 2020-06-30T02:29:22Z
dc.date.copyright Thu Jan 01 00:00:00 UTC 2009
dc.date.embargo 2013-06-05
dc.date.issued 2009-01-01
dc.description.abstract <p>Accelerated bridge construction (ABC) is the general term given to a variety of approaches aimed at reducing construction durations of bridge projects. Using these approaches on bridge projects introduces a number of advantages including reduced traffic disruption and increased safety. This thesis is comprised of two papers that focus on a number of ABC projects completed in the state of Iowa in the last decade. The first paper highlights the construction aspects of these projects and gives an evaluation of the projects based on criteria related to rapid construction and gives a comparison of the project cost to non-ABC projects. A road user cost analysis is also presented to demonstrate the cost benefit of decreased traffic disruption. The paper closes with a collection of lessons learned from the projects and a look into the future of ABC technologies. The second paper focuses on the design of accelerated bridge projects and the progression of the bridge elements and connection details over time. The paper includes an evaluation of the design of these bridges.</p>
dc.format.mimetype application/pdf
dc.identifier archive/lib.dr.iastate.edu/etd/10563/
dc.identifier.articleid 1564
dc.identifier.contextkey 2806731
dc.identifier.doi https://doi.org/10.31274/etd-180810-2309
dc.identifier.s3bucket isulib-bepress-aws-west
dc.identifier.submissionpath etd/10563
dc.identifier.uri https://dr.lib.iastate.edu/handle/20.500.12876/24769
dc.language.iso en
dc.source.bitstream archive/lib.dr.iastate.edu/etd/10563/Becker_iastate_0097M_10400.pdf|||Fri Jan 14 18:23:30 UTC 2022
dc.subject.disciplines Civil and Environmental Engineering
dc.subject.keywords accelerated
dc.subject.keywords bridge
dc.subject.keywords construction
dc.subject.keywords Iowa
dc.title Evaluation of accelerated bridge construction methods and designs in the state of Iowa
dc.type thesis
dc.type.genre thesis
dspace.entity.type Publication
relation.isOrgUnitOfPublication 933e9c94-323c-4da9-9e8e-861692825f91
thesis.degree.level thesis
thesis.degree.name Master of Science
File
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Becker_iastate_0097M_10400.pdf
Size:
52.69 MB
Format:
Adobe Portable Document Format
Description: