Analyzing Cycle Time Probabilities for Paced or Linked Assembly Files
Date
2000-11-01
Authors
Major Professor
Advisor
Committee Member
Journal Title
Journal ISSN
Volume Title
Publisher
Authors
Person
Research Projects
Organizational Units
Organizational Unit
Journal Issue
Is Version Of
Versions
Series
Department
Supply Chain Management
Abstract
This study presents a spreadsheet method for analyzing the probability of completing work at all stations on linked or mechanically paced assembly lines within a given cycle time. The method can be used to determine what cycle time to set, given a desired work load at each station. Alternately, given a desired cycle time and probability of completing all work at each station within the cycle time, the method can be used to determine how much work to allocate to each station on the line. Comparisons between the output of the spreadsheet method and simulations of the same system indicate the spreadsheet method is quite accurate.
Comments
Description
Keywords
Citation
DOI
Source
Subject Categories
Copyright
Sat Jan 01 00:00:00 UTC 2000