A comparison of design-bid-build and design-build project delivery methods on military construction projects

dc.contributor.advisor Edward Jaselskis
dc.contributor.advisor Kelly Strong
dc.contributor.author McWhirt, Darren
dc.contributor.department Department of Civil, Construction and Environmental Engineering
dc.date 2018-08-23T02:46:27.000
dc.date.accessioned 2020-06-30T07:37:32Z
dc.date.available 2020-06-30T07:37:32Z
dc.date.copyright Mon Jan 01 00:00:00 UTC 2007
dc.date.issued 2007-01-01
dc.description.abstract <p>The US Army Corps of Engineers has adopted the design-build project delivery method as a means to produce military facilities faster and cheaper. An analysis was conducted on 119 military construction projects executed by the US Army Corps of Engineers. While design-build awards may be made earlier in the delivery of military construction projects the design-build project delivery method was shown to have larger contract time growth compared to design-bid-build projects. Military design-build projects experienced a lower total cost of change orders as well as a reduced change order cost associated with field changes.;Finally, statistical analysis demonstrated that no significant difference existed in design-build performance based on the type of facility being constructed. This result indicates that the design-build project delivery method will work equally well on all types of military construction projects.</p>
dc.format.mimetype application/pdf
dc.identifier archive/lib.dr.iastate.edu/rtd/14556/
dc.identifier.articleid 15555
dc.identifier.contextkey 6984444
dc.identifier.doi https://doi.org/10.31274/rtd-180813-15741
dc.identifier.s3bucket isulib-bepress-aws-west
dc.identifier.submissionpath rtd/14556
dc.identifier.uri https://dr.lib.iastate.edu/handle/20.500.12876/68095
dc.language.iso en
dc.source.bitstream archive/lib.dr.iastate.edu/rtd/14556/1443090.PDF|||Fri Jan 14 20:22:15 UTC 2022
dc.subject.disciplines Civil Engineering
dc.subject.disciplines Military and Veterans Studies
dc.subject.keywords Civil
dc.subject.keywords construction
dc.subject.keywords and environmental engineering;Civil engineering (Construction engineering and management);Construction engineering and management;
dc.title A comparison of design-bid-build and design-build project delivery methods on military construction projects
dc.type thesis
dc.type.genre thesis
dspace.entity.type Publication
relation.isOrgUnitOfPublication 933e9c94-323c-4da9-9e8e-861692825f91
thesis.degree.level thesis
thesis.degree.name Master of Science
File
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
1443090.PDF
Size:
11.41 MB
Format:
Adobe Portable Document Format
Description: