A comparison of design-bid-build and design-build project delivery methods on military construction projects
dc.contributor.advisor | Edward Jaselskis | |
dc.contributor.advisor | Kelly Strong | |
dc.contributor.author | McWhirt, Darren | |
dc.contributor.department | Department of Civil, Construction and Environmental Engineering | |
dc.date | 2018-08-23T02:46:27.000 | |
dc.date.accessioned | 2020-06-30T07:37:32Z | |
dc.date.available | 2020-06-30T07:37:32Z | |
dc.date.copyright | Mon Jan 01 00:00:00 UTC 2007 | |
dc.date.issued | 2007-01-01 | |
dc.description.abstract | <p>The US Army Corps of Engineers has adopted the design-build project delivery method as a means to produce military facilities faster and cheaper. An analysis was conducted on 119 military construction projects executed by the US Army Corps of Engineers. While design-build awards may be made earlier in the delivery of military construction projects the design-build project delivery method was shown to have larger contract time growth compared to design-bid-build projects. Military design-build projects experienced a lower total cost of change orders as well as a reduced change order cost associated with field changes.;Finally, statistical analysis demonstrated that no significant difference existed in design-build performance based on the type of facility being constructed. This result indicates that the design-build project delivery method will work equally well on all types of military construction projects.</p> | |
dc.format.mimetype | application/pdf | |
dc.identifier | archive/lib.dr.iastate.edu/rtd/14556/ | |
dc.identifier.articleid | 15555 | |
dc.identifier.contextkey | 6984444 | |
dc.identifier.doi | https://doi.org/10.31274/rtd-180813-15741 | |
dc.identifier.s3bucket | isulib-bepress-aws-west | |
dc.identifier.submissionpath | rtd/14556 | |
dc.identifier.uri | https://dr.lib.iastate.edu/handle/20.500.12876/68095 | |
dc.language.iso | en | |
dc.source.bitstream | archive/lib.dr.iastate.edu/rtd/14556/1443090.PDF|||Fri Jan 14 20:22:15 UTC 2022 | |
dc.subject.disciplines | Civil Engineering | |
dc.subject.disciplines | Military and Veterans Studies | |
dc.subject.keywords | Civil | |
dc.subject.keywords | construction | |
dc.subject.keywords | and environmental engineering;Civil engineering (Construction engineering and management);Construction engineering and management; | |
dc.title | A comparison of design-bid-build and design-build project delivery methods on military construction projects | |
dc.type | thesis | |
dc.type.genre | thesis | |
dspace.entity.type | Publication | |
relation.isOrgUnitOfPublication | 933e9c94-323c-4da9-9e8e-861692825f91 | |
thesis.degree.level | thesis | |
thesis.degree.name | Master of Science |
File
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- 1443090.PDF
- Size:
- 11.41 MB
- Format:
- Adobe Portable Document Format
- Description: