Methods for Removing Concrete Decks from Bridge Girders, TR-647

dc.contributor.author Phares, Brent
dc.contributor.author Shane, Jennifer
dc.contributor.author Dahlberg, Justin
dc.contributor.author Dang, Hongtao
dc.contributor.department Institute for Transportation
dc.date 2018-02-15T06:03:34.000
dc.date.accessioned 2020-06-30T04:51:25Z
dc.date.available 2020-06-30T04:51:25Z
dc.date.embargo 2014-11-03
dc.date.issued 2014-08-01
dc.description.abstract <p>With ever tightening budgets and limitations of demolition equipment, states are looking for cost-effective, reliable, and sustainable methods for removing concrete decks from bridges. The goal of this research was to explore such methods. The research team conducted qualitative studies through a literature review, interviews, surveys, and workshops and performed small-scale trials and push-out tests (shear strength evaluations). Interviews with bridge owners and contractors indicated that concrete deck replacement was more economical than replacing an entire superstructure under the assumption that the salvaged superstructure has adequate remaining service life and capacity. Surveys and workshops provided insight into advantages and disadvantages of deck removal methods, information that was used to guide testing. Small-scale trials explored three promising deck removal methods: hydrodemolition, chemical splitting, and peeling.</p>
dc.description.comments <p>The related 3-page technology transfer summary, under the same title, can be found at: http://lib.dr.iastate.edu/intrans_techtransfer/</p>
dc.format.mimetype PDF
dc.identifier archive/lib.dr.iastate.edu/intrans_reports/72/
dc.identifier.articleid 1071
dc.identifier.contextkey 6319062
dc.identifier.s3bucket isulib-bepress-aws-west
dc.identifier.submissionpath intrans_reports/72
dc.identifier.uri https://dr.lib.iastate.edu/handle/20.500.12876/44914
dc.language.iso English
dc.relation.ispartofseries WBS: 25-1121-0003-134; Iowa DOT TR-647; InTrans 12-435
dc.source.bitstream archive/lib.dr.iastate.edu/intrans_reports/72/IADOT_InTrans_MTC_TR_647_Methods_Phares_Removing_Concrete_Decks_Bridge_Girders_2014_final.pdf|||Sat Jan 15 01:43:54 UTC 2022
dc.subject.disciplines Civil Engineering
dc.subject.keywords Bridge decks
dc.subject.keywords Bridges
dc.subject.keywords Concrete
dc.subject.keywords Girders
dc.subject.keywords Girder bridges
dc.subject.keywords Steel bridges
dc.subject.keywords TR-647
dc.title Methods for Removing Concrete Decks from Bridge Girders, TR-647
dc.type article
dc.type.genre report
dspace.entity.type Publication
relation.isAuthorOfPublication bc6ad184-1533-4161-b6ac-c0fa09f3e34c
relation.isOrgUnitOfPublication 0cffd73a-b46d-4816-85f3-0f6ab7d2beb8
File
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
IADOT_InTrans_MTC_TR_647_Methods_Phares_Removing_Concrete_Decks_Bridge_Girders_2014_final.pdf
Size:
7.45 MB
Format:
Adobe Portable Document Format
Description:
Collections