The Effect of Alternative Delivery on Accelerated Bridge Construction Projects

dc.contributor.advisor Jennifer Shane
dc.contributor.author Volk, Michael
dc.contributor.department Department of Civil, Construction and Environmental Engineering
dc.date 2021-01-16T18:26:30.000
dc.date.accessioned 2021-02-25T21:39:49Z
dc.date.available 2021-02-25T21:39:49Z
dc.date.copyright Tue Dec 01 00:00:00 UTC 2020
dc.date.embargo 2020-11-25
dc.date.issued 2020-01-01
dc.description.abstract <p>Accelerated Bridge Construction (ABC) is an option that state transportation agencies can use to repair or replace bridges in a shorter amount of time. This option offers a way to save on user costs and to increase the safety of the traveling public and the workers by reducing the amount of time that construction is ongoing. In the past thirty years, several alternatives to design-bid-build (DBB) project delivery have begun to be used by state transportation agencies, such as design build, construction manager general contractor and public private partnerships. The focus of this thesis merges these concepts to investigate what methods and technologies are used for ABC with alternative project delivery, and how alternative delivery methods allow for more innovation.Data was collected through a desk scan, survey, and case studies. The analysis that was conducted showed that agencies using alternative delivery methods are able to increase the applicability of geotechnical and construction (e.g. self-propelled modular transport) technologies for ABC. While agencies using DBB tend to focus on structural technologies such as precast beams. Case studies showed that alternative delivery methods provide more flexibility to the contractor, which allows them to use their experience to find innovative solutions. Further, alternative delivery methods allow for an increase in collaboration between designers, contractors and state transportation agencies.</p>
dc.format.mimetype application/pdf
dc.identifier archive/lib.dr.iastate.edu/etd/18420/
dc.identifier.articleid 9427
dc.identifier.contextkey 21104878
dc.identifier.doi https://doi.org/10.31274/etd-20210114-155
dc.identifier.s3bucket isulib-bepress-aws-west
dc.identifier.submissionpath etd/18420
dc.identifier.uri https://dr.lib.iastate.edu/handle/20.500.12876/94572
dc.language.iso en
dc.source.bitstream archive/lib.dr.iastate.edu/etd/18420/Volk_iastate_0097M_19211.pdf|||Fri Jan 14 21:41:49 UTC 2022
dc.subject.keywords Accelerated Bridge Construction
dc.subject.keywords Alternative Delivery Methods
dc.title The Effect of Alternative Delivery on Accelerated Bridge Construction Projects
dc.type dissertation
dc.type.genre dissertation
dspace.entity.type Publication
relation.isOrgUnitOfPublication 933e9c94-323c-4da9-9e8e-861692825f91
thesis.degree.discipline Civil Engineering (Construction Engineering and Management)
thesis.degree.level dissertation
thesis.degree.name Master of Science
File
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Volk_iastate_0097M_19211.pdf
Size:
1.25 MB
Format:
Adobe Portable Document Format
Description: