Time and Cost Analysis of Implementing a Mechatronic Experience in an Engineering Technology Course

dc.contributor.author Raman, D. Raj
dc.contributor.author Haughery, John
dc.contributor.department Department of Agricultural and Biosystems Engineering (ENG)
dc.date 2018-02-18T02:30:24.000
dc.date.accessioned 2020-06-29T22:34:49Z
dc.date.available 2020-06-29T22:34:49Z
dc.date.copyright Fri Jan 01 00:00:00 UTC 2016
dc.date.embargo 2016-12-14
dc.date.issued 2016-06-26
dc.description.abstract <p>Using an observational methodology, we studied the time and cost associated with developing and piloting a mechatronic experience in a first-year undergraduate engineering technology course. Our exploratory study included a sample size of 48 students across two sections of an existing course and analyzed the categories of capital, support staff, and instructor time and cost. Our capital purchases totaled ~$5,000, or ~$104 per student. Analyzing the capital verse capacity (class size) of our study, we found it to follow the chemical process industry’s common 0.6 economies of scale model. In contrast, support staff and instructor time and cost were not proportional to class capacity, but were primarily driven by the discrete stepped requirement of one teaching assistant per 50 students. Finally, setting our capital, support staff, and instructor costs as a function of class size, we projected a ~$4,000 per semester total cost, with a step size of ~$450 at each additional increment of 50 students.</p>
dc.description.comments <p>This paper was presented at presented at 2016 ASEE Annual Conference & Exposition, New Orleans, Louisiana. 10.18260/p.27041. Posted with permission.</p>
dc.format.mimetype application/pdf
dc.identifier archive/lib.dr.iastate.edu/abe_eng_conf/494/
dc.identifier.articleid 1494
dc.identifier.contextkey 9474297
dc.identifier.s3bucket isulib-bepress-aws-west
dc.identifier.submissionpath abe_eng_conf/494
dc.identifier.uri https://dr.lib.iastate.edu/handle/20.500.12876/531
dc.language.iso en
dc.source.bitstream archive/lib.dr.iastate.edu/abe_eng_conf/494/2016_Haughery_TimeCost.pdf|||Sat Jan 15 00:30:24 UTC 2022
dc.source.uri 10.18260/p.27041
dc.subject.disciplines Agriculture
dc.subject.disciplines Bioresource and Agricultural Engineering
dc.subject.disciplines Engineering Education
dc.title Time and Cost Analysis of Implementing a Mechatronic Experience in an Engineering Technology Course
dc.type article
dc.type.genre conference
dspace.entity.type Publication
relation.isAuthorOfPublication 0d20027b-c384-4033-aafe-d7cf62e10240
relation.isAuthorOfPublication 80d1fab7-1275-406b-93fb-ff803ab39083
relation.isOrgUnitOfPublication 8eb24241-0d92-4baf-ae75-08f716d30801
File
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
2016_Haughery_TimeCost.pdf
Size:
1.44 MB
Format:
Adobe Portable Document Format
Description: